Loading

The New Badr substation project delivered a new indoor GIS facility in Madinah rated 110/33/13.8kV, with a nine-bay switchgear arrangement split 5+4 across voltage levels. AECC supplied and installed four power transformers, two rated 50/67 MVA and two rated 50/70 MVA, together with 35 circuit breakers of 13.8kV switchgear and two 7 MVAR capacitor banks. The scope covered protection, control, SCADA and telecommunications systems, connection works to the network, and testing and commissioning.