AECC replaced the existing substation at Muzdalifa with a new 110/13.8kV facility, supplying the grid transformers, 13.8kV switchgear, capacitor banks and shunt reactors that form its core. The scope extended to the relay and control panels, AC/DC and auxiliary transformer panels, HV, MV and LV cabling, and a substation automation system with telecommunications integration.