This project expanded Maaden's existing 132kV substation at Waad Al Shamal with a two-bay 132kV GIS extension and two power transformers rated 123/137.5 MVA. AECC's scope covered the protection and power management system, MEP, HVAC and fire protection works, together with two new 132kV underground cable circuits running 6.5 kilometres and two 34.5kV underground cable circuits over a 600 metre route.