Loading

AECC delivered the medium- and low-voltage electrical grid for the MSTP power generation facility in Madinah Munawarah, supporting seven diesel-fuelled power blocks rated 2.8 MW each for a total installed capacity of 19.6 MW. The scope covered the full electrical infrastructure connecting the generation blocks into a coordinated MV/LV distribution network.

